Price: | CN¥1,443,000.00/sets 1-4 sets |
---|---|
Packaging Details: | pp hollow construction forwork template board plate extrusion production line machine<br>1.Mold package: Wooden package. <br>2.Outside package:Stretch film <br>3.Loading Qty : 2x40GP for one production line |
Supply Ability: | 5 Set/Sets per Month pp hollow construction forwork template board plate extrusion pr |
Name: | PP Sheet Making Machine | Plastic Processed: | PP |
---|---|---|---|
Application: | Sheet, Plates | Screw Design: | Single-screw |
Screw Material: | 38CrMoALA | Screw Diameter (mm): | 120 Mm |
Screw L/d Ratio: | 36:1 | Screw Speed (rpm): | 55 Rpm |
Place Of Origin: | Shandong, China | Brand Name: | Deerma |
Voltage: | 220V/380V/415V Or Customized | Dimension(l*w*h): | 26mx2mx2.8m |
Power (kw): | 110 | Warranty: | 1 Year |
Key Selling Points: | High Productivity | Video Outgoing-inspection: | Provided |
Core Components: | Motor, Pump, Gear, Pressure Vessel, Engine, Gearbox | Machinery Test Report: | Provided |
Plastic Machine: | Pp Hollow Construction Board Plate Extrusion Production Line Machine | Product Width: | 915-1220mm |
Product Thickness: | 12-20mm | Output Capacity: | 400-600Kg/hr |
Product Application: | Construction Concret Forming Work | Machine Control: | PLC -SIEMENS |
Machine Motor: | 110kw SIEMENS | Inverter: | ABB |
Guarantee Time: | 12months | Condition: | New |
Showroom Location: | Egypt, France, Peru, Saudi Arabia, Russia, Spain, South Korea, Chile, Romania, Bangladesh, Nigeria, Uzbekistan | Applicable Industries: | Hotels, Building Material Shops, Home Use, Construction Works |
Marketing Type: | Ordinary Product | Warranty Of Core Components: | 1 Year |
Weight: | 13 | Port: | Qingdao |
Highlight: | 110kw PP Sheet Making Machine,PP Sheet Making Machine 220V,415V Hollow Board Extrusion Line |
110kw SIEMENS Motor Hollow Construction Forwork Board Plate Extrusion Production Line with Power of 110kw and Template
Product Application
Machine name: PP Hollow Construction Formwork Porduction Line
Finished product : PP Construction Formwork , PP Formwork for Concrete Mould
Machine List |
|||
No. |
Name |
Qty. |
Remark |
1 |
Screw loader for SJ120/35 extruder |
1 |
|
2 |
Vacuum Loader for SJ75/35 |
1 |
|
3 |
SJ 120/35 single screw extruder |
1 |
For the middle layer |
4 |
SJ 75/35 single screw extruder |
1 |
For the surface layer |
5 |
Screen Changer1 |
1 |
For SJ120/35 Extruder |
6 |
Screen Changer2 |
1 |
For SJ75/35 Extruder |
7 |
Metering Pump1 |
1 |
For SJ120/35 Extruder |
8 |
Metering Pump2 |
1 |
For SJ75/35 Extruder |
9 |
Distributor for 3 Layers |
1 |
|
10 |
1000mm Extrusion Mould |
1 |
|
11 |
Vacuum Calibration Table |
1 |
3 Groups Calibration Mould |
12 |
Vacuum System |
1 |
|
13 |
Cooling Bracket (Forward) |
1 |
3000mm |
14 |
Haul-off Unit (Forward) |
1 |
High Quality Rubber Roller |
15 |
Cooling Bracket (Backward) |
1 |
3000mm |
16 |
Haul-off Unit (Backward) |
1 |
High Quality Rubber Roller |
17 |
Cutter |
1 |
|
18 |
Staker |
1 |
Normal information for construction formwork template
Plate size |
Thickness |
weight |
915mmx1830mm |
14mm |
10kg |
915mmx1830mm |
15mm |
12kg |
915mmx1830mm |
18mm |
13kg |
1220mmx2440mm |
14mm |
18kg |
1220mmx2440mm |
15mm |
20kg |
1220mmx2440mm |
18mm |
25kg |
Machcines's Pictures
Certification |
Certified By |
Certificate No. |
Business Scope Expiry Dat |
Expiry Date |
ISO 9001:2008 |
Beijing Hangxie Certification |
|
Design and Production of |
17/Sep./2013 |
CE |
European |
CN.CE.0680-10/10 |
Plastic Extrusion Machinery & |
29/Oct./2010 |
TUV |
TÜV Rheinland |
7467484_P+T |
Production & Trade Assessment |
15/Jan./2014 14/Jan./2015 |
Main Product Lines Verification Report |
TÜV Rheinland |
7467487_P+T |
Main Product Lines Verification |
15/Jan./2014 14/Jan./2015 |
SGS |
SGS-CSTC Standards Technical Services Co.,Ltd Focus Technology Co., Ltd |
QIP-ASR155278 |
Extrusion Machine, Pipe Machine ,profile Machine, Roof Machine… |
15/May./2015 |
DEERMA - Trade AssuranceLimit : US $306 ,000
1.100% Product quality protection
If the product quality does not meet the standards set in your contract, Alibaba.com will refund the covered amount of your payment.
2.100% On-time shipment protection
If your products are not shipped on time as per your contract, Alibaba.com will refund the cover amount of your payment.
3.100& Payment protection
If the supplier breaks the on-time shipment or product quality terms of your contract, Alibaba.com will refund the covered amount of your payment
Q: Is there quality control on all production lines?
A: Yes, all production lines have adequate quality control
Q: Do the QA/QC inspectors work independently from the production line?
A: Yes
Q:How many QA/QC inspectors in total?
A: 4
Q: Number. of Employees in Each Production Line
A: Supervisor 1 ; No. of Operators 29 ;No. of In-line QC/QA 2
2.Supplier Management
Q:Does the company have a supplier assessment procedure?
A:Yes
Q:Does the company have an updated list of approved suppliers?
A:Yes
Q:Does the company establish and implement a standard procedure for purchasing contract review and approval?
A:Yes, with written standard procedures
Q:Does the company keep its supplier assessment reports?
A:Yes, with written standard procedures
Now we have machines in stock,sincerely invite you to vist our factory! Also you can contact me for machine's running video.